• Preliminary feasibility study
• Design time schedule
• RAS dimensioning
• RAS production requirements
• Building footprint & layout drawing (LOD 100)
• Scope of Works (SOW)
• Cost & risk analysis
• System descriptions
• 3D & BIM modelling (LOD 400)
• Production and installation drawings
• Structural strength requirements
• Energy consumption
• Equipment & material lists
• Responsibility assignment (RACI) Matrix
• P&ID (Piping/Process & Instrument Diagram)
• Construction & handover time schedule
• Resource & performance requirements
• RACI Matrix coordination
• SH&E-, documentation- & quality control routines
• Communication & meeting routines
• Shipping & logistics
• BIM Coordination
• Site mobilization & excavation
• PE-pipe installation
• Mechanical equipment installation
• Document handling
• Construction progress meetings
• SH&E & quality control
• Time schedule & documentation reviews
• Initiate RAS startup process
• Scheduling, testing & documenting
• External and internal systems
• Electrical & mechanical equipment
• Water level & flow requirements
• Water quality parameters
• Control & monitoring systems
• Personell training
• Onsite handover meeting
• Design, project & commissioning document package
• Operations handbook (according to NS9416)
• Certificate of completion and warranty package
• Preventive maintenance & service agreement
• Project performance review & return on experience